Short answer

Before suing a contractor over a construction defect in a Texas residence, the owner must send the contractor written notice by certified mail at least 60 days before filing suit or starting arbitration, describing the defect in reasonable detail. The contractor may then inspect within 35 days and make a written offer to repair or settle within 60 days of receiving the notice. The Residential Construction Liability Act, Property Code chapter 27, enforces this by abating a suit filed without notice and by capping what an owner who rejects a reasonable offer can recover. It governs the claim whatever label it carries, including DTPA and negligence.

Tate Modern spiral staircase - 2025-09-27

What does the RCLA cover?

Every action to recover damages or other relief arising from a construction defect in a residence, whatever the legal theory, with a few exclusions (Tex. Prop. Code § 27.002). A construction defect is a deficiency in the design, construction or repair of a new residence, of an alteration, repair or addition to an existing residence, or of an appurtenance such as a garage, retaining wall or outbuilding (§ 27.001). Residence means a detached one- or two-family dwelling, a townhouse of up to three stories with its own exit, a duplex, triplex or fourplex, or a unit and the common elements in a condominium or cooperative. Apartment buildings held by an investor are not residences under the chapter.

Contractor is broad. It includes the builder who contracted with the owner, anyone who contracts to sell a new residence it built, and a person contracting with a condominium developer for new residences, and it extends to the contractor's owners, officers, directors, partners and employees. Subsequent purchasers who sue a builder are covered as well as the original buyer.

The chapter prevails over conflicting law, including the Deceptive Trade Practices Act and common law causes of action (§ 27.002(b)). It does not apply to personal injury, survival or wrongful death claims or claims for damage to goods, and it does not apply to claims for statutory fraud under Business and Commerce Code § 27.01, a contractor's wrongful abandonment of the project before completion, or misapplication of trust funds under Property Code chapter 162 (§ 27.002(d)). A homeowner whose builder walked off the job is outside the RCLA; a homeowner whose builder finished badly is inside it.

What notice is required before suit?

Written notice by certified mail, return receipt requested, to the contractor's last known address, sent at least 60 days before the claimant files suit or initiates arbitration, specifying in reasonable detail the construction defects that are the subject of the complaint (§ 27.004(a)). With the notice, or on request, the claimant must give the contractor any evidence that depicts the nature and cause of the defect and the extent of repairs needed, such as expert reports, photographs and video, to the extent it would be discoverable under Rule 192 of the Texas Rules of Civil Procedure.

Builders have their own notice duty. A written contract subject to the chapter, other than one between a condominium developer and a contractor, must contain a boldface statement that the contract is subject to chapter 27, that the owner must give the 60-day certified-mail notice before suing, and that the owner must allow inspection and cure if requested (§ 27.007). A contract missing that statement exposes the contractor to a civil penalty of $500 on top of any other remedy.

The inspection and offer timeline

StepDeadlineStatute
Owner's written notice of defects, certified mail, return receipt requestedAt least 60 days before filing suit or arbitration§ 27.004(a)
Contractor's inspection on written request (up to three inspections)Within 35 days after the contractor receives the notice§ 27.004(a)
Contractor's written offer of settlement: repairs by the contractor or an independent contractor, a monetary offer, or both, with a description and schedule of the repairsNot later than the 60th day after the contractor receives the notice§ 27.004(b)
Owner's acceptance, or written explanation of why the offer is unreasonableWithin 25 days after receiving the offer; an offer not accepted by then is considered rejected§ 27.004(b), (i)
Contractor's supplemental offer after the owner's explanationWithin 10 days after receiving the explanation§ 27.004(b)
Completion of accepted repairsNot later than the 60th day after the contractor receives written notice of acceptance, unless delayed by the owner or by events outside the contractor's control§ 27.004(b)

The parties may agree in writing to extend any of these periods (§ 27.004(h)), and they often do when an engineer's report is pending. Every notice under the section goes by certified mail, return receipt requested.

Example

Suppose a Frisco homeowner finds water intrusion at several window heads two years after closing on a new house. Her attorney sends the builder a certified letter describing the locations, enclosing the home inspector's photographs and a moisture report. The builder requests an inspection, sends its flashing subcontractor and a consultant within the 35 days, and on the 55th day offers in writing to remove and re-flash the affected windows and repair interior finishes within 60 days of acceptance. The owner's consultant believes the problem is a missing weather barrier behind all the stucco, not just the windows, and she says so in writing within 25 days. The builder makes no supplemental offer. If a court later agrees the offer was unreasonable for the real defect, no cap applies to her recovery; if it finds the window offer was reasonable, her damages cannot exceed the fair market value of that offer and she recovers only the attorney's fees incurred before she rejected it.

What if the owner rejects a reasonable offer?

The recovery is capped. If the claimant rejects a reasonable offer, or does not permit the contractor or its independent contractor to inspect or make the repairs under an accepted offer, the claimant may not recover more than the fair market value of the contractor's last offer of settlement (or the amount of a reasonable monetary or purchase offer under the chapter), and may recover only the reasonable and necessary costs and attorney's fees incurred before the offer was rejected or considered rejected (§ 27.004(e)). If the contractor fails to make a reasonable offer, those limits do not apply (§ 27.004(f)).

Reasonableness is a fact question and the center of most RCLA trials. The builder argues that its scope matched the defects described in the notice; the owner argues the offer ignored the cause or covered only the visible symptom. A written agreement can let the contractor elect to repurchase the home when repair costs exceed an agreed percentage of its value, paying the original price, closing costs, improvements and moving costs, and such an offer is considered reasonable absent clear and convincing evidence to the contrary (§ 27.0042).

What damages can a homeowner recover?

Only economic damages proximately caused by the defect, and only those listed in § 27.004(g): the reasonable cost of repairs necessary to cure the defect; the reasonable cost to replace or repair damaged goods in the residence; reasonable and necessary engineering and consulting fees; reasonable temporary housing expenses during repairs; the reduction in market value after repair, to the extent the defect is a structural failure; reasonable and necessary attorney's fees; and arbitration filing fees and the claimant's share of the arbitrator's compensation. Mental anguish and exemplary damages are not on the list, which is one reason the chapter's priority over the DTPA matters so much to builders.

The owner must also prove that the defect existed when the construction, alteration or repair was completed and that it proximately caused the damages (§ 27.006). The contractor is not liable for damage caused by someone else's negligence, by the owner's failure to mitigate, maintain or give timely notice, by normal wear or normal shrinkage cracking within building standards, or by reliance on inaccurate official government records it could not have known were wrong (§ 27.003).

What if suit was filed without notice?

The case is abated, not dismissed. If the claimant did not give the required notice, the court or arbitrator must, after a hearing, abate the action so the parties can go through the notice, inspection and offer steps (§ 27.004(d)). Abatement is automatic beginning on the eleventh day after a verified motion to abate is filed, unless the claimant files a controverting affidavit before then. The claim is paused, not lost, but the owner has handed the builder the timetable.

Notice is excused when it is impracticable because suit must be filed to avoid limitations, or where the defect claim is a counterclaim. In those cases the pleading must specify each defect, the contractor may inspect by the 75th day after service, and the offer is due by the 60th day after service (§ 27.004(c)). An imminent threat to health or safety is handled separately: the contractor must take reasonable steps to cure it as soon as practicable, and if it does not, the owner may have it cured and recover the reasonable cost plus fees (§ 27.004(m)).

How this fits with other claims

The RCLA is a procedure and a damages rule, not a cause of action. The underlying claims are still breach of contract, breach of warranty, negligence or DTPA, and they must still be brought within the limitations and repose periods; statute of repose and limitations for construction claims covers the six-year residential repose period that took effect in 2023. Construction defect claims in Texas explains who is liable and on what theory. The RCLA notice and the DTPA's own 60-day notice are often sent in one letter; the 60-day DTPA notice letter describes that requirement. For whether a demand letter is required in other kinds of business disputes, see do I have to send a demand letter before suing in Texas.

Tina Wysk represents homeowners, investors and builders in residential construction disputes in Dallas–Fort Worth courts and arbitration.

Questions on this topic

Does the RCLA apply to a remodel or an addition, or only to new homes?

It applies to both. A construction defect under the chapter includes a deficiency in the construction or repair of a new residence and in an alteration of, repair of, or addition to an existing residence, as well as in appurtenances such as garages, retaining walls and outbuildings. A kitchen remodel or a room addition on a house is covered; work on an apartment complex owned by an investor is not, because the building is not a residence as the chapter defines it.

Can I sue a Texas home builder under the DTPA instead of the RCLA?

You can plead a DTPA claim, but the RCLA governs it. The chapter prevails over the DTPA and common law causes of action to the extent of any conflict, so the 60-day notice, inspection, offer and damages cap apply to a DTPA claim arising from a construction defect, and recoverable damages are limited to the economic damages the RCLA lists. Mental anguish and treble damages under the DTPA are not available for a residential construction defect.

What happens if the builder ignores my RCLA notice?

A contractor that makes no offer, or no reasonable offer, within 60 days of receiving the notice loses the protection of the damages cap, and the owner may file suit after the 60 days and seek the full economic damages the chapter allows, including repair costs, consulting fees, temporary housing and attorney's fees. The builder's silence does not create liability by itself, but it removes its most valuable defense and usually makes settlement later more expensive for it.

Do I have to let the builder back into my house to make repairs?

If you accepted the builder's offer, yes. An owner who rejects a reasonable offer, or who accepts one and then refuses to allow the contractor or its independent contractor to inspect or perform the repairs, is limited to the fair market value of the last offer and to fees incurred before the rejection. An owner who has lost confidence in the builder can insist on repairs by an independent contractor within the offer, since the statute allows that form of offer, but cannot refuse all access and still recover in full.

Is the RCLA notice the same as a demand letter?

It serves a similar purpose but has stricter rules. It must go by certified mail, return receipt requested, to the contractor's last known address, at least 60 days before suit or arbitration, and must describe the defects in reasonable detail and be accompanied by the evidence the owner has. A demand letter that does those things satisfies the chapter; one sent by email, or one that only threatens suit without describing defects, does not, and the resulting suit can be abated.

Next step

Discuss a construction payment or defect dispute

Tina Wysk handles construction disputes for businesses and individuals in Dallas state and federal courts. A short conversation is usually enough to see where you stand.

Sources

  1. Tex. Prop. Code §§ 27.001–27.002 (definitions of construction defect, contractor, residence; scope of the chapter, priority over the DTPA, exclusions for personal injury, statutory fraud, abandonment and chapter 162 claims)
  2. Tex. Prop. Code § 27.003 (limits on contractor liability: others' negligence, failure to mitigate or maintain, normal wear and shrinkage, reliance on government records)
  3. Tex. Prop. Code § 27.004 (60-day certified-mail notice, 35-day inspection, 60-day offer, 25-day response, 10-day supplemental offer, 60-day repairs, cap on recovery after rejecting a reasonable offer, abatement, limitations and counterclaim exception, emergency repairs, recoverable economic damages)
  4. Tex. Prop. Code § 27.0042 (conditional repurchase election and the presumption that a compliant purchase offer is reasonable)
  5. Tex. Prop. Code § 27.006 (claimant must prove the defect existed at completion and proximately caused the damages)
  6. Tex. Prop. Code § 27.007 (required contract disclosure of chapter 27 and the $500 civil penalty for omitting it)

Legal sources last checked November 6, 2026. Statutes and rules change; the date matters.

Tina Wysk

About the author

Tina Wysk

Shareholder, Hallett & Perrin, P.C.. Tina represents businesses and individuals, as plaintiffs and defendants, in contract, partnership, fiduciary duty, fraud, construction, trade secret and investment disputes in Texas state and federal courts and in arbitration.

About Tina

This guide is general information about Texas and federal law for business owners, not legal advice about your situation. Statutes, rules and court decisions change, and small facts change outcomes. Reading it or contacting Tina Wysk through this site does not create an attorney-client relationship.

CallDiscuss Your Matter